Two existing holiday homes located outside the building zone are to be replaced by a new building. The facades are planned in rammed earth without any additional colour additives. Unfortunately, the existing excavated material is not suitable for clay walls. For this reason, the material for the clay walls must be brought in. The walls will be rammed on site.